Composite sampling flow meeting -RJN and Tioga - 9 April 2026

Date: 2026 04-April 09

Pasted image 20260409100955.png
Pasted image 20260409101023.png

Wolf river is still sampling based on time to create a composite, rather than flow based sampling.

Pasted image 20260409101351.png

Pasted image 20260409101531.png

Presidents island seems to have a pump issue.

Pasted image 20260409101559.png

Plan to shutdown manhole 9

There is a month left in the program.

Pasted image 20260409102534.png
This sample was pulled on March 25th. We are getting high metals in the Horn Lake area.