BioAir
Description:
Installed at the plant at the junction box just prior to Headworks and other locations, to mitigate the escape of Hydrogen sulfide that is in the influent pipe.
Multiple installations, primarily for reducing odor / odor control.
The BioAir system pulls significantly less Hydrogen sulfide volume compared to the BioRem system.
Monitor:
- pH
- conductivity, because it indicates the ratio of solids to liquids
Key people or groups:
Item | OneDrive Shared File Location |
---|---|
BioAir Drawings | ./O&M-Manuals/BioAir/GMP3-P&ID.pdf |
BioAir Photos | ./Equipment-Plant-Photos/BioAir/ |
BioAir Training | ./O&M-Manuals/BioAir/P20114-Training-Presentation.pdf |
Training:![[P20114 Training Presentation (1).pdf]]
Vibration problem on Jesco MAGDOS LB system, needs additional fixturing to minimize vibration: explained by Mike Brower:
Damp Rid system - still useful?