Preliminary Engineering Review for TE Maxson Main Aeration Blower System
Date: 2025 08-August 27
Malasari Engineering, Gresham Smith, and Maxson
This meeting will primarily discuss electrical issues.
There in the conference room (Fine Bubble Diffuser people)
- EDI
- Next Turbo
- E-Tech
The main goal today is to start and stop blowers.
Gary Garrison's History and Status Rundown
- We have 6x 1500HP blowers
- Installed in 1969
- "TWAC"
- Radiators were removed later, so now there are TWAC air cooled
- Over the years we have added a couple of air cooled motors.
- Electrical system starter - reduced voltage, two pole, auto transformers.
- There have been issues with blowing up the auto transformers.
- The control system is about 400 feet from the system itself, so you don't know what is happening at the bucket.
- If there is a fuse blown, there have sometimes been a single-pole start.
- Lately: Across the line start
- Vacuum interrupters. Cutler Hammer <-- (Original) Westinghouse IQ's.
- Schweitzer equipment (7/10-5)
- It would be nice to have a soft start system. Eaton Soft Start. This would be more reliable than the vacuum interrupters.
- Bentley Nevada Machine Health System (1970's style), monitoring standalone - not connected to Ovation system. Monitors motor RTD's.
- Updated machine health wishlist
- Differential pressure, see when the air filters are dirty
- Vibration monitoring
- Turnkey DCS system
- Motor bearing temperature
The boys from Gresham Smith (Sid Hamby, Craig Parker, and Jason Carroll) will bullet point the immediate scope.