WesTech Trickling Filter 5 Post failure inspection, meeting 1
Date: 2025 08-August 26
Current situation:
- Dustin Bosh is onsite, performing a third party inspection.
- Last week Trickling filter 5 crashed and suffered serious damage.
Key attendees of this meeting:
History
- Trickling filter 5 was put into service in November 2024. Each trickling filter was put in at a different time.
Dustin Bosh:
- Currently the entire weight of the system is resting on two bolts.
- Now we need to shore up or put dunnage under the barrel of the trickling filter, so that if (when) the remaining two bolts fail, it won't slam into the media and cause further damage.
Yaribell Hernandez (CDM Smith):
- If the city needs assistance, CDM Smith offers subcontractor assistance to stabilize the situation
Next Steps:
- Max Foote will come on site to add dunnage to the trickling filter arms at between 2/3 to 75% of their length, as indicated by Kevin Ball, presumedly of WesTech. Maxson will not provide plant personnel to perform the assistance, as per the explicit direction of Tasha King-Davis with support from Yaribell Hernandez.