BioRem Details and Maintenance & Calibration Plan

#assignment
Contact: Henry Nakayama
Date: 2025 01-January 31

N:\Treatment Plants\Maxson Plant\TEM Biogas\

Key people: Carlton Mull, Stacy Bullard, Krishna Bejjanki, Chris Luss (unload priority), Rodney Williams

Talk to people/Tersea Espy at contractors/Diamond Scientific about calibrating equipment/SWG100 biogas analyzer, the equipment/Optima7 handheld biogas analyzer, and the equipment/OptimaMax handheld biogas analyzer. Also the 6 equipment/Amatek biogas flow meters which need to be calibrated, by Andy LeJeune at Contractors/Bar Environmental. If any of the flow meters cannot be calibrated, Bar Environmental will order new flow meters as we need them. We should have at least six spare Amatek biogas flow meters on a shelf somewhere - where are they (ask Chris Luss)? Also ask about where the spare equipment/SWG100 biogas analyzer is being stored. Move the storage of the flow meters and analyzers for the BioRem system to a rack in my office for now.

  1. Clayton Bennett's office (good for low mass, high sensitivity)
  2. The pipe gallery (low Hydrogen sulfide, but high humidity)

Other equipment (?) look for manual, SOP, O&M doc, etc for all BioRem equipment. The O&M documents may have been provided by CDM Smith. The BioRem project was funded by government/TVA.